Roof Tiling and Slating
Concrete, clay and slate roof coverings on housing developments, specified against programme, supply and wind exposure and fitted consistently plot by plot.
Explore Roof Tiling and Slating

Complete roofing packages for housebuilders, with cost, programme and compliance risk taken off the roofing line.
Globe Roofing delivers complete roofing packages on new build housing developments across the East of England and the Midlands, from our base at Highfields Farm, Fulbourn, near Cambridge. The work is volume housing, not one-off jobs: a package priced plot by plot, a programme that holds, and plots ready for the next trade when the build sequence needs them. Buyers and quantity surveyors appoint us to take cost, programme and compliance risk off the roofing line, and construction directors keep us because the standard on the last plot matches the first.
Our work includes 650 units at Hocklawn, Nottingham. Across the business we run around 12 live sites, with multiple contracts managers tracking progress plot by plot and flagging issues before they reach the programme. That capacity sits behind every tender, so when plot release accelerates the resource is already in the business rather than being found mid-scheme.
We price new build schemes plot by plot as standard. Each plot type is built up from roof areas measured against drawings, with its components, fixing schedule and ventilation specification documented, and a rate agreed before contract award. There is no averaged scheme rate to drift when the plot mix on a later phase differs from the first, and the monthly valuation becomes a count of completed plots against agreed rates. The reasoning is set out in why plot-based pricing gives developers greater cost certainty. On larger packages, standardised specification and consolidated supplier orders feed directly into the plot rate, as explained in how we deliver competitive pricing on large residential developments.
The lowest roofing tender is rarely the cheapest roof once programme drift, rework and warranty issues are counted. We price for delivery, with supervision, material cover and operative depth built into the rate, so the normal contingencies of a live site do not become lost weeks. Internal trades cannot start until a plot is weathered in, which makes the roof a critical milestone. Our article on why roofing programme certainty matters more than the lowest price sets out the questions worth asking every bidder, and our programme and multi-phase delivery page covers sequencing, gang allocation and adverse weather.
Like almost every roofing contractor working at scale on UK housing, we deliver through subcontractor gangs, which lets resourcing follow the actual rate of plot release. The difference is the management system around them. CSCS cards and competency are verified before mobilisation, crews are briefed against plot-specific quality plans, and supervision works to documented inspection points from first fix to completion sign-off. Our ISO 9001 quality management system applies the same procedure to every crew, every plot and every phase.
Plot rates are agreed across the full development, so commercial terms are not renegotiated at each phase. The felt and batten specification, fixing schedule, ventilation provision and cold bridging details agreed for phase one carry through every later phase, and site management and gang composition stay consistent wherever the programme allows. Read how we manage multi-phase roofing programmes on large developments and how we deliver continuity across phased residential developments.
Every plot is fitted to the manufacturer fixing specification and the warranty body detail, then photographed and signed off, so the compliance record is built as the work happens rather than reconstructed afterwards. We work to NHBC, LABC and Premier standards and inspections, and each plot is signed off internally before the inspector is invited. Our Construction Quality Review scores give you third-party evidence of the standard. The detail is on our NHBC, LABC and Premier compliance page.
The package covers roof tiling and slating to manufacturer specification, dry fix systems for verge, ridge and valley, roof ventilation and condensation control including the eaves and cold bridging details inspectors check, and felt, batten and fixing specification set against each site's wind load calculation under BS 5534.
Globe Roofing sits within a group that covers the build sequence around the roof. Globe Civil Engineering delivers groundworks, Globe Cambridge provides the scaffold our gangs work from, and Red Safety Netting provides fall protection. Where more than one package is awarded to the group, the interfaces between trades are managed inside one group rather than left between separate contractors. Housing association work is handled by our regeneration, repair and maintenance division, and completed schemes are on our roofing projects page.
Planning the roofing package on a development? Contact Globe Roofing, email enquiries@theglobegroup.co.uk or call 01223 890727.
New Build Developments

Concrete, clay and slate roof coverings on housing developments, specified against programme, supply and wind exposure and fitted consistently plot by plot.
Explore Roof Tiling and Slating

Dry verge, dry ridge, dry hip and dry valley systems installed as standard on new build housing, replacing mortar with mechanical restraint and built-in ventilation.
Explore Dry Fix Systems

Ventilation, cold bridging and eaves detailing on new build roofs, set by each plot type and verified against the design before the inspector arrives.
Explore Roof Ventilation and Condensation Control

Underlay, batten and fixing specification on new build roofs, checked against each site wind load calculation and the manufacturer fixing schedule before work starts.
Explore Felt, Batten and Fixing Specification

Roofing delivered to NHBC, LABC and Premier standards, signed off internally before inspection and backed by ISO 9001 plot records and strong CQR scores.
Explore NHBC, LABC and Premier Compliance

Roofing programmes sequenced with scaffold, resourced by managed gangs and held consistent across every phase of a large housing development.
Explore Programme and Multi-Phase Delivery
FAQs
We price plot by plot. Each plot type is built up from roof areas measured against drawings, with components, fixing schedule and ventilation specification documented, and a rate is agreed before contract award. If a planning amendment introduces a new plot type mid-programme, it is priced on the same basis. Valuations and the final account then become a count of completed plots against agreed rates.
From the first few plots through to multi-phase developments of several hundred units. Our work includes 650 units at Hocklawn, Nottingham, and we run around 12 live sites with multiple contracts managers. We are resourced for volume housing and can scale gangs across a scheme as plot release changes.
Yes, as almost every roofing contractor working at scale on UK housing does. What matters is the management around them. We verify CSCS cards and competency before mobilisation, brief every crew against plot-specific quality plans, and supervise to documented inspection points. Our ISO 9001 system applies the same procedure to every crew on every phase.
Yes. As part of the Globe Group we can align roofing with groundworks from Globe Civil Engineering, scaffold from Globe Cambridge and safety netting from Red Safety Netting on the same development. The interfaces between those trades are then managed within one group, which keeps the programme moving and reduces the coordination load on the principal contractor.
We work across the East of England and the Midlands from our base near Cambridge. If you have a development outside that area, talk to us and we will tell you honestly whether we can deliver it well. To discuss a roofing package, email enquiries@theglobegroup.co.uk or call 01223 890727.
Projects


Insight

On a housing development, the roofing work is technically identical from one plot to the next. Same construction. Same tile specification. Same fixing schedule. Same flashing…

On a residential development, the lowest tender on the roofing package is almost never the cheapest version of the roof. The price that gets accepted at the moment of award is the…

On phased residential schemes, the roofing programme is rarely continuous. Plots release in tranches. Foundation pours happen weeks or months apart. Brickwork advances at…